Within 4 weeks our crews have erected the Butler pre-engineered metal buiding for an addition to Wausau Supply located in the Weston Industrial Park. This building is 400'x328' and features one bay that clear spans 81' as to not have any columns serve as obstacles in the shipping and receiving area.
Friday 23 March 2018