
Crews have started the frame work to replace the existing structure that burnt down due to a fire approximately a month for Jeff Dierich's project outside of Marathon. The new Pinno wood framed structure is being installed over the existing 24' x 26' concrete foundation. The building will be fully insulated with a white interior metal cover panel.