ur company recently received an award from Butler Manufacturing, our pre-engineered metal building affiliate, on the achievement of 60 million dollars of purchases of steel building material through their company.
Here is a building we completed last year for Kafka Granite just west of Mosinee. This building will serve as Kafka Granite's natural stone veneer production facility.
A couple months ago our crews finished a 11,840 sq.ft. automotive body repair building for One Way Collision on the west side of Merrill.
Within 4 weeks our crews have erected the Butler pre-engineered metal buiding for an addition to Wausau Supply located in the Weston Industrial Park. This building is 400'x328' and features one bay that clear spans 81' as to not have any columns serve as obstacles in the shipping and receiving area.
Crews have the majority of the steel up for a 60' x 100' x 56' Butler pre-enigneered metal building in Mosinee.
Last week Downtown Grocery re-opened after being closed since having a fire in 2015 on Third Street in Wausau. We are proud to be a part of the re-building project by supplying and fabicating the steel that was required to support the existing walls, new roof, mezzanine, railings and handrails.
Here is a 60' x 120' Butler pre-engineered commercial buiding project we completed earlier this year for Hands-On Cleaning. The building is located in the Wausau Industrial Park
We are proud to assited River Valley Bank on their teller & entry remodel at their 17th Ave location in Wausau.
Our crews have finished construction on a 12,000 sq. ft. facilty for Peter Trucking located just south of Athens, WI.
The Deer Run Stone project that we started the end of April in Minocqua offically opened for business the last week of June.