Posting an updated photo of the highway billboard sign we buildt for Pinno's new office near the Highway 51 truck stop just south of Merrill
We fabricated and installed something I don't think we ever did before, we built and installed a billboard sign.
Last Friday our crew started on a 105'x100'x20' low eave/24' high eave Butler pre-engineered metal building in Minocqua and by Saturday afternoon our crew had the majority of the steel standing.
Our crews have finished an arched roof canopy for the Wausau Curling Club. Urban Construction engineered the steel required for the project with the steel fabricated by Schuette Metals from Rothschild.
Swiderski Equipment in Antigo held their open house recently and they held it in an addition we built for them last fall. The 70' x 120' x 28' building addition was produced from Butler Manufacturing
Here are a few photos of before and after our crews replaced the exterior wall panels for K & M Electric in Schofield, WI. Project also included replacing a couple walk doors and overhead doors.
Our crews have completed enclosing the 96' x 184' new building for Brickner's of Antigo. The building will be used for RV repair and includes a paint booth. The building features 8' high perimter masonry, R-33 wall insulation and R-40 roof insulation.
Our crews have finished erecting the steel for a new store location near Minocqua. The 6,000 sq.ft. building will feature...
Our crews have started erecting the metal building steel for the new Premier Sports Academy located in Weston.
One of our crews have finished the steel framing for a 60' x 200' metal building for Premier Companies in Merrill.